Route 19B for Echo State Park

RCI is served as the general contractor for the construction of a 2.5 mile road through the proposed new state park in Shannon Co. Missouri. The new County Rd 19B will connect County Rd 19-250 to Hwy 19 through the new park including a bridge over Sinking Creek. The project consists of grading, concrete paving, and drainage structures. Also included is a massive 450ft stone veneered bridge, two concrete arch span culverts, and gravity stone walls. During the course of the New State Park project, deterioration of the Rte. 19 Sinking Creek Bridge cut off the supply of materials to the entire site. RCI constructed a 360ft temporary steel span structure including grading and paving in approximately three 3 weeks restoring Rte. 19 to truck traffic above the previously imposed 20 ton limit. This project is scheduled to be complete by March of 2016.

Vitals:

Size:
2.5 Miles
Value:
$11,203,942.81
RCI Role:
General Contractor
Completion:
May 2016
   |