Mississippi County, Ar. Job # 100760 – State Highway 77 & 140

$4,705,005 – The purpose of this project is to replace bridge structures in Mississippi County. The project consists of grading, paving, one continuous composite W-Beam unit bridge 442’ in length, one integral W-Beam unit bridge 148’ in length, and one precast temporary detour bridge 112’ in length.  Over 648,000 pounds of rebar and structural steel were used to build the bridges along with over 2,200 cubic yards over concrete.  Grading consisted of over 20,000 cubic yards of embankment including the installation of special geogrid for stabilization.  Construction began in the spring of 2016 and is scheduled to be completed by winter of 2017.

Vitals:

Size:
Value:
$4,705,005.00
RCI Role:
General Contractor
Completion:
Fall 2017
   |